Use Case: Shale Gas Development Planning Meets Petroleum Economics

Optimizing development of a shale gas play requires analysis of many variables including well capability, well inventory, rig and frac crew counts and availability, infrastructure considerations, lease obligations and capital constraints. Using Enersight, all of these variables can be easily modeled to assess production and economic impact.

With integrated scheduling and modeling, Enersight equips you to define the best development approach through project lifecycle – from the well to the processing facility to the sales points. Read the case study.

Learn more about 3esi-Enersight Solutions for LNG Projects.